Case Studies

Barnett Park Staircase Replacement

Replacement of the original stairs, damaged in the earthquakes and restoring a cherished part of our city's heritage.

Selwyn River Piles

HGM installed 3 foundations and stood poles for a new Selwyn River crossing Connetics were completing as part of the Orion NZ Ltd network.

Kura Tāwhiti (Castle Hill) Track Upgrade

HGM completed the track and timber step installation work as part of The Kura Tāwhiti Visitor Impact Mitigation Project on the stunning Arthur's Pass in Canterbury.

Wooded Gully Track Upgrade

HGM were contracted to complete an upgrade on the Wooded Gully Walking Track situated in the Mt Thomas Conservation Area to complete a 2.5km loop track that meets the DOC Short Walk Standards

Hanmer Waterfall Track

The Waterfall track leading to the Dog Stream Falls is one of Hanmer’s busiest walking tracks. The track had some steep rocky sections making the track challenging for some track users and dangerous during the winter months or during high use periods.

Quail Island Pou Installation

HGM Construction were engaged to install a 8.5m, totara pou whenua (land post) that had been carved at the Lyttelton Carving School on Ōtamahua (Quail Island).