Case Studies

Automatic Identification System Towers

HGM Construction were contracted to work alongside Outback Communications Limited in installing three Automatic Identification System (AIS) Towers around Banks Peninsula.

Cliffs Rd Anchored Retaining Wall

HGM constructed a 2.5-3 m high anchored timber pole retaining wall and a 2.5m Steel UC retaining wall with a Cirtex T-Recs and Promat matted slope secured with 60 Platipus earth anchors.

Lyttleton Pipeline Project

HGM were engaged to assist McConnell Dowell with some Sub-contract work on the Wastewater Pipeline Project in Lyttelton Harbour.

Godley Head Sewage System

HGM were engaged to carry out the civil site works for the installation of an on-site waste water servicing system for the public toilets at the Barracks site at Godley Head

Retaining Wall at The Brae

Following the February 2012 Earthquake, the dwelling and garage was demolished, leaving only the garage slab and the driveway at the top of the steep section. A retaining wall was required to enable the new house to be built on the section.

Sumner Road Anchoring

HGM Construction were contracted to carry out Anchoring work on two retaining walls as part of the Sumner Road Reopening Geo-technical Risk Mitigation Works Project following damage incurred in the 2010-2011 Canterbury Earthquakes.